Supply and Install Bulk Electrical Supply including Transformers, Switchgear, MCC and Sub- Station Buildings in Saldanha.

Sustain the materials handling capacity at the Port of Saldanha

Cape Town

Scope: Sustain the materials handling capacity at the Port of Saldanha by the addition of a third Tippler. As part of the tippler 3 project, new bulk electrical supply infrastructure is provided to increase the capacity of the existing power supply to meet current and future demand at the Port of Saldanha. The control and instrumentation scope was to design, supply and install the fibre optic networks, CCTV camera system, Intruder alarm system, fire detection and suppression system as well as the VOIP system. Project management, commissioning services, and final optimisation.